SUMMARY

Challenge

■

To meet a tight construction schedule in a logistically

challenged site due to location and land dimensions

• To install elevators used during the construction

process and then converted into permanent ones

• To incorporate intelligent solutions that meet the

varying needs of the tenants

Solution

■

Providing construction time use elevators to ensure

project completion with maximum efficiency

■

High-speed 8 m/s elevators that include destination

control to enable the best people flow experience

FAST FACTS

Headquarters Business Park

■

Completed: 2014

■

Size: 175,000 sqm

■

Height: 250 m west tower;

70 m east tower

■

Floors: 52-story west tower;

13-story east tower

■

Maximum speed: 8 m/s

■

Building owner: Adeem Alwataniah

■

Developer: Al Dar Alkhasa (DK)

■

Architect: Battley Partners

■

Contractor: Freyssinet

KONE Solutions

■

13 KONE MiniSpace

™

elevators

■

18 KONE MonoSpace

®

elevators

■

2 KONE TransitlMaster

™

120

escalators

■

KONE Polaris

™

Destination

Control System

■

KONE E-Link

™

monitoring

system

■

KONE Care

™

Maintenance

Service