SUMMARY

Challenge

■

To create a one-off elevator concept that is visually

and technically integrated with the architect’s

uncompromising vision

■

To provide smooth transition between low-, mid- and

high-rise elevator groups

■

To oversee the challenging installation of the scenic cars,

which had to be installed in one piece and delivered

along a tight corridor

Solution

■

Successful technical and architectural integration was

achieved during two years of intensive collaboration

with the contractor and architects

■

All three elevator groups adhere to a common design

principle, with a unique brightly colored sling

■

As the building has no concrete core, all wiring is

concealed in the back wall and floor units, achieving

a clean, minimalistic effect

■

Special destination control software provides smooth

automatic transfer at the push of a single button

FAST FACTS

122 Leadenhall

■

Completed: 2014

■

Height: 224 m

■

Floors: 45

■

Maximum speed: 8 m/s

■

Building owner: British Land and

Oxford Properties

■

Developer: British Land and Oxford

Properties

■

Architect: Graham Stirk of Rogers

Stirk Harbour + Partners

■

Contractor: Laing O’Rourke

KONE Solutions

■

24 KONE MiniSpace

™

scenic

elevators

■

2 KONE MiniSpace

™

elevators

■

6 KONE TransitMaster

™

120

escalators

■

2 customized platform lifts

■

KONE Polaris

™

Destination Control

System

■

KONE E-Link

™

monitoring system

© The Leadenhall Building

© The Leadenhall Building

15