SUMMARY

Challenge

■

To complete installation of elevators and

escalators before the opening ceremony of the

Nanjing Youth Olympic Games

■

� To ensure that all elevators and escalators on Line

S8 operated reliably to create smooth people flow

Solution

■

Manpower and material input was increased and

resource allocation was optimized to complete the

installation on schedule

■

An emergency response team was established during

the Nanjing Youth Olympic Games to provide all-round

service to ensure reliable equipment operation

FAST FACTS

Nanjing Metro Line S8

■

Completed: 2014

■

Track length: 45,216 km

■

Stations: 17 (6 underground,

11 above ground)

■

�Operator: Nanjing Metro Operation

Co., Ltd.

■

�Developer: Nanjing Metro Operation

Co., Ltd.

■

�Architect: Beijing Urban Engineering

Design & Research Institute Co., Ltd.

■

Main Contractor: China Railway

Electrification Bureau Group Co., Ltd.

KONE Solutions

■

37 KONE MonoSpace

®

elevators

■

75 KONE TransitMaster

™

140

escalators

■

KONE Care

™

Maintenance

Service

43